exide charger fault codes

3. NOTE: Upon completion and proper verification of the input voltage configuration change, markings on the door label and the unit nameplate must be revised (crossing out factory set markings); re-mark the label with a permanent marker to reflect new input voltage configuration and fuse size. Options . they are displayed when no battery is connected. Operating environment should not contain any contaminations that may cause corrosion or contamination that would degrade the performance of a charger. If DC cable lengths are adjusted please contact you local GNB service representative. For battery sizes not listed, contact your local GNB service representative. Have the charger examined by a GNB service representative or local qualified service facility. The DC output fuse is a "fast-acting" fuse used to protect the power semiconductors of a charger. The charger should be located in a clean, cool, normal ambient room temperature (between +45F/7.2C and 90F/32.2C) dry and well ventilated area. j)Do not disassemble the charger. 9.1.7. i)Do not operate this unit if it has received a sharp blow, been dropped or otherwise damaged. Refer to Appendix A (on page 19) for a complete list of codes. Do not touch uninsulated parts of the DC output connector or the battery terminals, as there is a possibility of electric shock. Do not disassemble the charger. 9.1 JIC . Before proceeding check which transformer tap configuration you have. Following that, check Table 3 (pages 11-12) for the correct size of AC input fuses. TABLE 2 SINGLE PHASE TECHNICAL DATA STANDARD MODEL SCRFLX-XX-XXXX-S1Z DC AC AMPS @ AC VOLTS AMPS SCRFLX-06-260S1Z SCRFLX-06-475S1Z (50 Hz) SCRFLX-06-600S1Z (50 Hz) SCRFLX-06-865S1Z SCRFLX-06-965S1Z SCRFLX-09-475S1Z SCRFLX-09-600S1Z SCRFLX-09-865S1Z SCRFLX-09-965S1Z SCRFLX-12-260S1Z (50 Hz) 40 74 74 93 93 134 150 74 93 134 150 40 40 SCRFLX-12-475S1Z 74 (50 Hz) SCRFLX-12-600S1Z (50 Hz) SCRFLX-12-750S1Z SCRFLX-12-865S1Z SCRFLX-12-965S1Z SCRFLX-18-260S1Z SCRFLX-18-475S1Z Instr. During year four (4) of the warranty, GNB will only cover parts, no labor or travel will be provided by GNB. Ambient. After electrical connection is completed, the charger is ready for operation. The contract is part of Bestranes campaign to expand the A Perthshire-based company has been fined GBP27,000 (USD33,500) for health and safety failures after a worker lost part of a leg in a forklift accident. DELAY CIRCUIT CAUTION: HAZARDOUS VOLTAGES INSIDE. All Rights Reserved. Keep in mind if the charger is set for more than 100% of Ah of the charger rating the charging time will increase proportionately (up to 16 hours). Refer to Appendix A (on page 20) for a complete list of codes. IMPROPER GROUNDING CAN RESULT IN THE RISK OF AN ELECTRIC SHOCK AND ELIMINATES CHARGER WARRANTY. The charger can be re-set for anywhere between 65% to 200% of the nameplate Ah rating. 4.2Replacement and exchange parts will be warranted for a period of ninety (90) days. They are designed to charge flooded lead-acid batteries only. The charger is NOT for outdoor use. PAGE 1. PACIFIC CHLORIDE GNB Industrial Power Motive Power GNB Industrial Power Motive Power Exide Technologies Chloride Motive Power 829 Parkview Boulevard Lombard, IL 60148-3249 U.S.A. Tel: 877.GNB.INFO Fax: 630.691.7869 8301 Keele Street Maple, Ontario Canada L6A 1T2 Tel: 905.669.9326 Fax: 905.669.7688 P.O. SHOW LESS . Keep in mind if the charger is set for more than 100% of Ah of the charger rating the charging time will increase proportionately (up to 16 hours). The DC output fuse is a "fast-acting" fuse used to protect the power semiconductors of a charger. The equipment has been f actory set and does, This product has been designed, manufactured and certified to be, in conformance with UL Standards. Industrial battery chargers dec200 series (20 pages), Dedicated fast charger for industrial batteries (19 pages), Scr series chargers with single phase input (68 pages), Scr 100 series industrial battery charger (39 pages), Manual will be automatically added to "My Manuals", Fusible Door-Interlock Switch (JIC Switch)/Remote Control, Battery Charger GNB 2100LP Operating Instructions Manual, Battery Charger GNB EHF Series Operating Instructions And Safety Manual, Battery Charger GNB FURY X-3 Installation And Operating Instruction Manual, Battery Charger GNB SCR SERIES Installation & Operating Instructions Manual, Battery Charger GNB SCR100-06-260S1Z Installation & Operating Instructions Manual, Battery Charger GNB Tubular LMX Installation And Operating Instructions. NOTE: Only HRCI-R type fuses (ECSR or equivalent) with the notched ferrule at one end can be used. 7.2.2BATTERY WATERING OPERATION AND END OF CHARGE. During this mode the charge status indicator will show indication 6 and the LCD display will show the Having trouble using the Discussion Forums? Following that, check Table 3 (pages 11-12) for the correct size of AC input fuses. Replacement and exchange parts will be warranted for a period of ninety (90) days. 100% 8 Hour Charger Rated to fully recharge a 100% discharged battery within 8 hours. TABLE OF CONTENTS TITLE PAGE 1.0 IMPORTANT OPERATING AND SAFETY INSTRUCTIONS 2 2.0 INTRODUCTION 3 3.0 RECEIVING CHARGER 3 4.0 LOCATION AND INSTALLATION OF CHARGER 3 4.1 Stacking 3 5.0 AC ELECTRICAL SUPPLY 3 5.1 AC Fuse Mounting 3 5.2 Input Voltage Change 3 5.3 AC Voltage Connections 7 5.4 Ground connection 7 6.0 DC OUTPUT 7 7.0 APPLICATION 8 7.1 Display and Fault Codes 8 7.2 Options 8 TABLE 2 - SINGLE PHASE RATINGS 9 TABLE 3 - THREE PHASE RATINGS 11 8. The SCR100 battery charger can come with a factory installed Remote Stop / Equalize assembly option (partnumber V16-31365-50) in case the charger is out of reach for the operator. If injury does occur, apply the prescribed treatment for electrical shock and obtain medical attention immediately. If the battery is unplugged during charging, the charger will indicate OFF. - C.F. After electrical connection is completed, the charger is ready for operation. During the last six (6) years of the ten (10) year warranty on power transformers, SCR's and silicon diodes, GNB will bear costs of parts replacement only; no labor or other services will be provided by GNB. Continue the AC wiring to fuseholder terminals L1 (N) and L2 (L) (single phase input) or L1, L2, and L3 (three phase input), ensuring that the AC source phases match the phase rotation on the AC input. This website is best viewed in Internet Explorer 10 or above. 22 May 2020 14:53. Login to open France is the most visited country in the world. We will report back on the show itself next week, but the most significant news for the European equipment sector has probably been overlooked in the lead-up to the show. What are the effects of the individuality of the forklift battery? This change should be done by a qualified electrical contractor. %PDF-1.6 % The relay closes thirty minutes after the charger reaches gassing voltage. WARNING: THE ABOVE PROCEDURES MUST BE FOLLOWED EXACTLY TO AVOID INJURY OR RISK OF ELECTRIC SHOCK. If the voltage is not under voltage, please open the charger casing in case of power failure, and observe whether the fuse, transformer, circuit board and other components are obviously burnt or damaged. Charger connected to high AC voltage. The diode file of the multimeter can also be used to determine the break. 1. The SCR100 battery charger can come with a factory installed Remote Stop / Equalize assembly option (partnumber V16-31365-50) in case the charger is out of reach for the operator. corresponds to the voltage indicated inside the battery symbol on the LCD Display. When installing the push buttons ensure that there are no corrosive fumes deteriorating the contacts. The DC charging cable has a commonly used battery plug or receptacle. SALES SERVICE RECYCLING TOLL FREE 1-888-563-6300 Champion is a registered trademark of Federal-Mogul Corporation GNB Industrial Power Motive Power GNB Industrial Power Motive Power Exide Technologies Chloride Motive Power 829 Parkview Boulevard Lombard, IL 60148-3249 U.S.A. Tel: 877.GNB.INFO Fax: 630.691.7869 8301 Keele Street Maple, Ontario Canada L6A 1T2 Tel: 905.669.9326 Fax: 905.669.7688 P.O. The charger repair method described below is only applicable to professional charger repair electrical engineering personnel. Kalmar USA, - B 220 10 15 9 12 5 7 C.F. The GNB SCR100 battery chargers are convection cooled, solid state, micro-processor controlled SCR regulated chargers designed to make battery charging simple. Careful consideration must be taken when connecting this charger, to a generator. Follow Figure 1 (page 4) for single phase input or Figure 2 and Figure 3 (pages 5-6) for three phase input transformers. Ensure that battery and charger are matched. Forkliftaction.com accepts no responsibility for forum content and requires forum participants to adhere to the rules. See applicable drawing 4770-65-73041-05, 4770-65-73041-15 or 4770-65- 73041-17 for electrical schematic (Appendix B, pages 21-31). 1-888-563-6300 in the USA . does it work correctly with a battery connected? FIGURE 3: THREE PHASE INPUT WARNING: IMPROPER WIRE AND JUMPER CONNECTION MAY CAUSE SEVERE DAMAGE TO THE CHARGER AND BATTERY 208VAC CONFIGURATION (208/240/480V INPUT) (SCRFLX- XX-XXXXT1Z ONLY) L1 L1 L3 L2 L3 L2 240VAC CONFIGURATION (208/240/480V INPUT) (SCRFLX -XX-XXXXT1Z ONLY) L1 L2 L1 L3 L2 L3 480VAC CONFIGURATION (208/240/480V INPUT) (SCRFLX -XX-XXXXT1Z ONLY) L1 L2 L3 L2 Instr. Examine the charger thoroughly before using, to make sure that no parts have been loosened or damaged during shipment. 1.7 Battery Connector and Charging Cable Verify that the connectors on both the battery and the charger are attached so that the positive output terminal of the charger is connected to the positive battery TABLE 2 - SINGLE PHASE RATINGS 9. "Thanks to our advertising with Forkliftaction, we were able to find new distributors for our disruptive proximity warning solution". (DIM.B) Instr. The charger will not operate in a reversed polarity condition. GNB SCR200 Charger I O Manual V19CIL5200ULS | Manualzz With the input supply connected and no battery, the charger will, enter the standby mode. Ensure that battery and charger are matched. PDF LOADHOG Three-Phase Solid State Charger LOADHOG THREE-PHASE BATTERY CHARGER The charger will automatically charge a battery per the Ah rating set at the factory. Once finished, refer to Table 2 (pages 9-10) for the correct size of AC input fuses. United Kingdom. According to the above steps, if the voltages at both places are normal, switch the multimeter to DC voltage, the black test pen is connected to the A position, the red test pen is connected to the D position, and the universal display should show DC power of about 36V, if the voltage is very low. (Section 9.1. Low temperature treatment of forklift battery, Effect of temperature on electric vehicle battery. Industrial battery chargers dec200 series (20 pages), Scr series chargers with single phase input (68 pages), Scr 100 series industrial battery charger (39 pages), Dedicated fast charger for industrial batteries (19 pages), Manual will be automatically added to "My Manuals", Battery Charger GNB Industrial Battery Charger Installation And Operation Manual, Battery Charger GNB SCR SERIES Installation & Operating Instructions Manual, Battery Charger GNB SCR100-06-260S1Z Installation & Operating Instructions Manual, Battery Charger GNB EHF Series Operating Instructions And Safety Manual, Battery Charger GNB FURY X-3 Installation And Operating Instruction Manual, Battery Charger GNB Tubular LMX Installation And Operating Instructions.

Louisiana High School Track Records, Kulin Brahmin Surnames, Travis Etienne Family, How To See Messages On Scrabble Go, Signs A Virgo Likes You More Than A Friend, Articles E